Roche ACCU-CHEK Inform II Manuale dell'Operatore Pagina 82

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 81
Linearity Testing
82
Applying a linearity test sample Once the meter has detected the test strip, you will be
prompted to apply the linearity solution.
1 Wait until the flashing drop appears in the display
before applying the solution.
2 Apply a drop of the linearity solution to the front
edge of the test strip. Do not apply the solution to
the top of the strip.
The linearity solution is pulled into the test strip
area by capillary action.
Once sufficient linearity solution has been detected, the
meter beeps and the measurement begins.
Linearity Test 12:48pm
03/16/10
Linearity 12345678 L1
Strip Lot 545794
Vedere la pagina 81
1 2 ... 77 78 79 80 81 82 83 84 85 86 87 ... 159 160

Commenti su questo manuale

Nessun commento