Roche ACCU-CHEK Inform II Manuale dell'Operatore Pagina 78

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 77
Linearity Testing
78
Information stored during
linearity testing
The following information is stored for every linearity test:
Test result
Lot number of the linearity solution
Level of linearity solution (L1 to L6)
Operator ID (if configured)
Lot number of the test strips
Time and date of test
Comments (if present)
Linearity test kit The linearity test kit contains glucose solutions in six
levels (6 vials, 2.5 mL each). For additional information
about the contents and handling of the kit, refer to the
package insert.
Preparing to run a linearity test Aside from special preparations (see the following sec-
tion), a linearity test is run the same as a patient test.
Please check the following:
At least one code file for test strips must be stored
in the meter and match the lot number of the test
strips used (see Chapter 6).
The proper test strips must be available.
An operator ID must be entered (with password, if
applicable), if the meter is configured for login.
Vedere la pagina 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 159 160

Commenti su questo manuale

Nessun commento