Roche ACCU-CHEK Inform II Manuale dell'Operatore Pagina 79

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 78
Linearity Testing
79
Performing a linearity test
Overview of test procedure A linearity test comprises the following steps:
Check the lot number of the linearity solutions.
Check the lot number of the test strips.
Perform the test with a minimum of three linearity
solutions.
Starting a linearity test The following description assumes that the meter is
powered on and the main menu is displayed.
1 Touch in the Main Menu to open the Main
Menu 2 screen.
2 Touch Linearity to start the linearity test. The
Linearity Test screen opens.
Linearity Test
03/16/10
12:48pm
Use Linearity Lot 12345678?
Main Menu 12:48pm
03/16/10
Review Results
Control Test
Patient Test
Main Menu 2 12:48pm
03/16/10
Maintenance
Strip Lots
Prociency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
Vedere la pagina 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 159 160

Commenti su questo manuale

Nessun commento